SEAI Retrofit BOQ Ireland — 24-Hour SEAI Compliant Cost Plans | RapidQS

/// Ireland Retrofit QS Service

SEAI-Compliant Retrofit BOQ
Delivered in 24 Hours.

Specialist quantity surveying for retrofit contractors and One Stop Shop providers across Ireland. Every report built to SEAI grant approval standards. Accepted first time.

24hrTurnaround
500+SEAI Reports
15+Irish Clients
5★Google Rating

Get Your SEAI Cost Plan →

🇮🇪 SEAI National Home Energy Upgrade Scheme  |  ✅ One Stop Shop Compatible  |  ⚡ 24-Hour Delivery  |  📋 Accepted First Time

Why Irish retrofit contractors choose RapidQS

We’ve priced hundreds of SEAI retrofit projects across Ireland. We know what EWI costs in Laois, what attic insulation runs in Mayo, and exactly what format SEAI needs for grant approval.

24-Hour SEAI BOQ

Send us your property details today. Receive a fully-priced, SEAI-compliant BOQ tomorrow — ready to submit for grant approval without delays.

🏠

One Stop Shop Ready

We work directly with SEAI-registered One Stop Shop providers. Our reports match the exact format and detail required for OSS grant submissions.

📊

Irish Rate Database

Built on 500+ Irish retrofit projects. We use current Irish market rates — €35–55/hr labour depending on region — so your BOQ is accurate, not estimated.

First-Time Acceptance

Our reports are formatted to meet SEAI’s exact requirements. Near-100% first-submission acceptance rate across all measures and scheme types.

🔄

Volume Capacity

From a single property to 50+ per month. Ideal for OSS providers and large retrofit contractors managing multiple SEAI applications simultaneously.

💶

50% Less Than Traditional QS

Traditional Irish QS firms charge €1,500–€5,000 per report and take 2–4 weeks. We charge €799 and deliver in 24 hours.

SEAI Measures We Price

All measures covered under the National Home Energy Upgrade Scheme

External Wall Insulation (EWI)
Internal Wall Insulation
Attic Insulation
Heat Pump Systems
Windows & Doors
Airtightness Works
MVHR Ventilation
Solar PV
Heating Controls
Nap Render Finish

How It Works

Three steps to a SEAI-compliant BOQ. No site visit. No delay.

1

Send Your Project

Email us the property address, BER cert, and measures required. Drawings optional but welcome.

2

We Price It

Our team draws on 500+ Irish retrofit projects and current SEAI-approved rates. BOQ built to specification.

3

BOQ Delivered

Full priced schedule within 24 hours. SEAI grant-ready format. PDF + Excel. Revisions included.

4

Grant Approved

Submit to SEAI with confidence. Our reports are accepted first time — protecting your cashflow and timeline.

SEAI Retrofit Pricing

All prices in Euro. Includes SEAI-compliant format and grant-ready documentation.

Single Property BOQ

€799
All standard measures · 24-hour delivery
  • EWI, attic, or windows/doors
  • SEAI grant-compliant format
  • 24-hour delivery
  • One revision included
  • PDF + Excel output

Get Started →

Most Popular

Full Retrofit BOQ

€799
All measures · One property · 24hrs
  • All SEAI measures covered
  • EWI + attic + heat pump + windows
  • OSS grant submission ready
  • 48-hour delivery
  • Two revisions included
  • PDF + Excel + Summary

Get Started →

OSS Monthly Retainer

€4,000
Per month · Unlimited volume
  • Unlimited BOQs per month
  • Dedicated account manager
  • Same-day turnaround
  • Branded in your OSS format
  • Priority queue
  • Monthly rate review

Book a Call →

All prices ex VAT @ 23%. One flat price — €799 per property. Volume discounts for 10+ jobs/month. Contact us.

Trusted Across Ireland

From Laois to Mayo, Dublin to Cork — Irish contractors rely on RapidQS

★★★★★5.0 — Google Reviews
★★★★★

“Submitted our SEAI grant application with the RapidQS BOQ and it was approved first time. They know exactly what format SEAI requires. Saved us weeks.”

Ray M.
Plastering Contractor, Co. Laois
★★★★★

“We manage 30+ SEAI retrofit projects a month. RapidQS handles all our BOQs on retainer. Fast, accurate, and they never miss a deadline.”

Dylan R.
Retrofit Contractor, Dublin
★★★★★

“Irish rates, SEAI format, 24-hour delivery. Exactly what we needed. We’ve used them on 8 projects across Mayo and Galway now.”

Michael B.
Construction Manager, Co. Mayo

Trusted by Irish retrofit contractors

RM Plastering — Co. Laois
CJ Residential — Dublin
TuiWood Projects — Portugal/Ireland
Retrofit Contractors — Co. Mayo
Midlands Builders — Offaly

SEAI Retrofit FAQ

Is the BOQ accepted by SEAI for grant approval?

Yes. Every report follows the exact format required by SEAI for the National Home Energy Upgrade Scheme. We have a near-100% first-submission acceptance rate.

Do I need drawings to get a BOQ?

No. For standard SEAI measures we can work from a BER certificate, property address, and measure list. Drawings improve accuracy but aren’t required.

Do you understand Irish labour rates?

Yes. We use current Irish market rates — €35/hr rural, €40–55/hr Dublin — and we’re familiar with regional differences across all 26 counties.

Can you support One Stop Shop providers?

Yes. Our retainer is designed specifically for OSS operators processing 20–50+ SEAI applications per month. We become your dedicated QS team.

What’s included in the 24-hour guarantee?

Submit before 3pm and receive your completed BOQ by 3pm the next business day. If we miss it, the report is free.

Ready to submit your
next SEAI application?

Send us your property details and we’ll have a SEAI-compliant BOQ ready within 24 hours.

Send Your Project →

Or WhatsApp David: +44 7438 628277

Scroll to Top